Pool Safety Certificate
Full barrier compliance inspection. Form 23 issued same-day. Council lodgement guidance for City of Greater Geelong.
Highton is Geelong's hillside suburb, with terraced housing across rising terrain south of the Barwon River. That topography is why Highton throws up more pool fence complications from slope, retaining walls and split levels than any other Geelong suburb.
After hours or can't talk right now? Leave your name and number and Ryan will call you back the same day where we can.
We're in Highton weekly from our Clifton Springs base, and the usual booking turnaround runs about 3 to 5 days.
Council: Highton sits fully within the City of Greater Geelong, with the standard registration and lodgement process applying.
Slope creates compliance complications. Pool barriers on sloping sites need careful AS1926.1 interpretation. The 1.2m fence height is measured from the finished ground level on the climbable side — but on terraced properties, an adjacent retaining wall can quietly cut that distance in a way you won't spot by eye. We see more interpretation disputes between owners, builders and council on Highton properties than anywhere else, especially around split-level decks and pool-adjacent retaining walls.
1970s-1990s pool stock. Highton's main residential expansion was the 1970s and 1980s, and many original pools are now well into their second or third compliance cycle. The hillside positioning means most pools are at ground level relative to the house but elevated relative to the street — barrier specs need to consider the lower-side height accurately.
How Highton compares to its neighbours. Belmont next door shares a similar era of housing stock but sits on flatter ground, so it doesn't carry Highton's slope-related interpretation questions; Newtown has an even older housing stock again. Waurn Ponds and Grovedale are the newer, mixed-age suburbs on the other side of Highton, which raise their own set of questions again.
If a barrier doesn't pass first time, the Highton re-inspections page covers the free follow-up in detail, including how the slope-related items typically get resolved. Planning a new pool or a retaining wall near an existing one first? The Highton compliance consultation is worth booking before the fencer starts, and it's the same $250 flat fee either way.
Yes. Every pool or spa capable of holding more than 300mm of water has to be registered with the City of Greater Geelong, and every registered pool then sits on a mandatory four-year re-inspection cycle from the date of the last Form 23. Given how much of Highton's stock is genuinely 1970s-1980s era and well into its second or third cycle, if a pool has never been registered at all, that's a different and more urgent conversation than a routine re-inspection.
Not sure whether your Highton pool is currently registered, or when it was last inspected? That's a quick thing to check before booking — call and we can usually work it out over the phone. On a terraced Highton property specifically, it's also worth confirming whether the last inspection actually accounted for the slope correctly, since that's the detail most likely to have been missed or misjudged years ago.
Flat $250 — same-day Form 23 where compliant, free re-inspections, no hidden fees.
Full barrier compliance inspection. Form 23 issued same-day. Council lodgement guidance for City of Greater Geelong.
Detailed compliance report for Highton property buyers — ideally before contract signing.
Written report with each non-compliance item flagged, plus practical fix advice — DIY vs tradesperson.
Complimentary follow-up after remediation work. No second call-out fee.
Failed an inspection, or planning ahead of one? Two Highton-specific services cover both.
Pool failed its inspection? The follow-up visit is free once the listed items are fixed — same-day Form 23 where it now passes.
Planning a new pool on a sloping block? Get the barrier right before you build it.
Same flat $250 across our entire service area.