Form 23 on the Day
We check the full barrier, and if it passes you get the Form 23 on site, ready to lodge with Moorabool Shire.
BPC (formerly the VBA) registered pool safety inspector, Form 23 issued on site when the barrier passes, $250 flat.
Call now — or we'll call you back
After hours or can't talk right now? Leave your name and number and Ryan will call you back the same day where we can.
Only the barrier, but on these blocks that can be a long walk. The planning maps show large-lot rural residential zoning, and the 2021 census counted 272 private dwellings, almost all separate houses. Every pool sits inside its own boundary, and the barrier is whatever stands between the water and the rest of the block. Usually that's a purpose-built pool fence. Where a stretch of boundary fence forms part of it, we walk that stretch and test every gate in it.
Paddock fencing, dams and water tanks aren't pool barriers, and a stock fence running past the pool doesn't become one. Gates are where pools come unstuck: across all our jobs, the defect we write up most is a gate that has stopped self-closing or self-latching, usually from a tired hinge, a worn closer or a latch that has crept out of line. A longer barrier usually has more gates to fail. If the house is empty, sort out access and tell us when you book.
Nearby, Brookfield and Melton West have their own pages. For Bacchus Marsh, read our page for that suburb; for lodgement, see the Moorabool lodgement notes. Before the visit, work through our pre-inspection checklist.
It can change what we find, not how we test. The middle of the locality is basalt plain ground, sheetflow basalt with colluvium on the geology map, and soil like that moves between wet and dry seasons, taking fence posts with it. A gate that clicked shut in winter can drag or miss its latch by late summer. So each gate gets released from wide open and from part-way, not just from the angle you walk through it.
Down towards the Werribee River the planning scheme marks five inundation overlay areas, land that can go under in a flood. The barrier has to do the same job there as anywhere else. The ground is what's different. After heavy rain a post can lean just far enough that the latch stops catching, so if it's been wet, open the gate and let go of it yourself before we arrive.
Parts of the locality carry environmental and landscape overlays, fourteen environmental areas and four landscape ones, and there are no listed heritage places. Trees by themselves aren't a barrier problem. A climbable foothold near the fence is, whether that's a shrub, a low branch, a garden bed, a retaining edge or a stack of firewood, and we check the ground around the barrier for each.
Check with council before you cut anything back. Removing vegetation inside an overlay can need a permit, and that application is yours to make, not ours. Once you've picked a fix, a permitted prune or a moved woodpile, tell us and we'll come back and look again.
Hopetoun Park sits in Moorabool Shire, and that's the council that keeps your pool on its register. When the barrier passes we issue the Form 23 on site, and you, as the owner, lodge it within 30 days.
Moorabool registers pools through the Greenlight portal, where you upload the certificate yourself. Fees and contact details are on our Moorabool council page.
The four-year cycle runs from council lodgement, not from the day of the inspection.
Not far at all. We're based in Maddingley, a short run down the Western Freeway, and most bookings here are inspected inside the week. There are no set days. We batch jobs by area as calls arrive, so ringing early puts you on a run that's already coming this way.
A pool barrier inspection is $250 flat. The rest of the district is on our areas we service page.
Flat $250 — same-day Form 23 where compliant, free re-inspections, no hidden fees.
We check the full barrier, and if it passes you get the Form 23 on site, ready to lodge with Moorabool Shire.
Anything that fails goes on a written list. Fix it, let us know, and we come back with no second call-out fee.
On a big lot, a long fence and several gates can add up to a real repair bill. Get the barrier looked at before the sale goes unconditional.
Flat $250 — same-day Form 23 where compliant, free re-inspections, no hidden fees.
Gate hardware, fence runs and climbable zones, all assessed against the barrier standard.
A written fix list before the official visit, if you'd rather know where the barrier stands first.
How registration works, and when the four-year cycle starts.
What the $250 includes, and what falls outside it.
Same flat $250 across our entire service area.